Concrete Hardstanding for Exceed Logistics
BCJ Construction partnered with Exceed Logistics to design and construct a heavy-duty concrete hardstanding and yard area, tailored specifically for HGV parking and daily logistics operations. This project was critical in supporting the company’s growing fleet and streamlining site access and vehicle movement.
Project Overview
Key elements of the development included:
Concrete Hardstanding: Full ground preparation and installation of a reinforced concrete surface designed to withstand continuous use by heavy goods vehicles.
Yard Layout: Optimised design to maximise usable space and allow efficient vehicle manoeuvring, loading, and parking.
Integrated Drainage System: Installation of a robust drainage solution to manage surface water effectively, ensuring compliance with environmental standards and preventing future maintenance issues.
Our Approach
BCJ Construction provided a turnkey solution—from initial design through to completion—ensuring the works were delivered on time and to a high standard. Our team worked closely with Exceed Logistics to ensure all operational needs were met while maintaining site safety and minimising disruption.
Outcome
The completed yard has significantly improved operational efficiency and capacity for Exceed Logistics, providing a durable and practical surface fit for intensive commercial use. This project reflects BCJ Construction’s expertise in delivering tailored infrastructure solutions for the logistics and transport sector.
For more information about our services and other past projects, see our website.